
Dam and Water Resource Level and Volume Monitoring
Maximizing dam and water resource management with advanced level and volume monitoring
Enhancing efficiency with near real-time dam and water volume monitoring
Promoting proactive resource management with robust IoT technology
Utilizing battery-operated sensors for sustainable and reliable monitoring
Solution
The Dam and Water Resource Level and Volume Monitoring Solution delivers near-real-time water height tracking, volumetric capacity storage calculation, evaporation loss monitoring, spillway discharge alerts, and seasonal reserve analytics across open agricultural dams, reservoirs, lakes, and water catchments without the expense or complexity of traditional wired telemetry. Utilizing an innovative floating buoy transmitter paired with an integrated submersible hydrostatic level sensor, the system automatically adapts to fluctuating water margins, shifting shorelines, and bank erosion. Designed for rapid field deployment across vast rural and industrial water assets, the system arrives fully pre-configured out of the box to stream encrypted sensor telemetry directly to the Ellenex Software Platform.
This IoT-driven water resource monitoring solution offers key operational advantages:
Zero-Touch Plug-and-Play Setup: Shipped fully pre-programmed for immediate deployment in under 5 minutes without requiring local software programming, driver setup, or developer configurations.
Flexible Dual LPWAN Protocols: Choice of LoRaWAN® (ideal for private farm networks or mining campuses with zero ongoing airtime fees) or NB-IoT / LTE-M (for direct public cellular transmission across dispersed regional reservoirs).
Adaptive Floating Buoy Architecture: Combines a UV-resistant, impact-proof marine floating buoy enclosure with an IP68 316L stainless steel hydrostatic probe that accommodates rising and falling water shorelines.
Submersible Hydrostatic Precision: Delivers high accuracy water depth tracking (submerged up to 100 meters) paired with heavy-duty vented cable assemblies for automatic atmospheric pressure compensation.
Low Total Cost of Ownership: Powered by an internal replaceable 3.6V Lithium battery paired with ultra-low-power firmware to achieve maintenance-free operational lifespans of up to 10 years.
Rapid Capital Return: Accelerates ROI by eliminating manual gauge pole readings, predicting seasonal water deficits early, optimizing irrigation pumping, and preventing uncontrolled dam spillover damage. Learn More


Easy Install

Pre-Configured

Secure

Quick ROI

Rugged Design

Battery Operated
Our Dam and Water Resource Level and Volume Monitoring Solution provides a comprehensive approach to efficient water resource management and storage control. By leveraging cutting-edge technology in floating buoy transmitters and IP68 hydrostatic level sensors, water managers, farmers, and civil engineers can track, control, and optimize open water storage assets from anywhere. The result is a future-proof solution that not only addresses current operational challenges—eliminating manual gauge pole readings and predicting water deficits early—but also adapts to the changing demands of industrial compliance, ultimately protecting water security, operational resilience, and environmental health.
Connecting farm dams, tailing ponds, and municipal reservoirs to a central digital network transforms static water bodies into an intelligent resource monitoring network. By streaming continuous hydrostatic telemetry directly to a cloud dashboard, property managers and water engineers gain complete visibility over total storage reserves while eliminating manual inspection drives.
Asset Visibility
Continuous telemetry from floating buoy hydrostatic sensors provides complete operational visibility across widely distributed farm dams and remote water storage catchments. By bringing real-time water height, percentage full capacity (%), total volumetric storage ($\text{m}^3$ or Megalitres), and battery health metrics directly onto a centralized mobile or web dashboard, asset owners can monitor multi-reservoir networks across thousands of hectares without conducting manual gauge checks.
Resilient Operation
Heavy-duty marine buoy construction paired with an IP68-rated submersible 316L stainless steel sensor head delivers uncompromised structural reliability across extreme weather conditions, high wave action, and shifting shorelines. The floating design prevents the wireless transmitter from being submerged or stranded as water levels fluctuate dramatically during heavy rains or prolonged droughts. Automated high-water and spillway warnings instantly alert managers to impending dam overtopping, allowing site teams to initiate controlled releases before bank erosion occurs.
Resource Sustainability
Continuous volume tracking directly supports sustainable water conservation by enabling precise evaporation loss analytics and drawdown rate monitoring. By mapping water surface drop rates against weather trends, station managers can calculate real-time evaporation rates, identify underground dam liner leaks, and optimize irrigation pumping schedules. Conserving surface water reserves reduces reliance on groundwater extraction, while automating site checks significantly cuts farm vehicle fuel consumption and carbon emissions.
Battery-powered industrial hydrostatic level monitoring with LoRaWAN or NB-IoT/LTE-M connectivity for remote water tanks.
Core Operational Capabilities
IP68 Submersible Hydrostatic Level Sensor Probe (316L Stainless Steel)
LoRaWAN / NB-IoT / LTE-M
IP68 Submersible Sensor
IP68 UV-Protected Enclosure
Up to 10-Year Battery Life
Cloud / API / SCADA Integration
UV-Resistant Impact-Proof Marine Buoy / Floating Transmitter Unit

Advanced Dam and Water Resource Level Monitoring with Ellenex Floating Enclosure
LM-RD-W

Effective dam and water resource management is crucial for ensuring the adequate supply of water for agriculture, industry, and domestic use, as well as preventing devastating floods.
Industrial Outdoor LoRaWAN Gateway Specifications
For customers deploying the LoRaWAN package, the high-performance industrial gateway provides complete self-managed coverage. It is pre-configured to forward packet data to the Ellenex Platform.

System Architecture
The integrated Solution telemetry platform is designed around a dual-LPWAN (Low Power Wide Area Network) hardware architecture, giving operators the flexibility to deploy either LoRaWAN or cellular-based (supporting NB-IoT and LTE Cat M1) network configurations depending on local infrastructure and regional topology. Both communication technologies represent the cutting edge of industrial IoT, designed to penetrate challenging physical barriers and achieve multi-kilo meter propagation distances while maintaining extremely low electrical current draws.
The Ellenex telemetry pipeline follows a streamlined 4-step end-to-end data flow designed to give customers total choice over their network infrastructure and software platform:
-
Sensor: The single Ellenex battery-powered field device directly measures physical parameters, digitizes analog signals, applies factory calibration parameters, packages telemetry into AES-128 encrypted payloads, and manages low-power sleep modes within a unified unit. Learn More:
-
Wireless Infrastructure Options:
-
Option A (LoRaWAN Option): Transmits sub-GHz radio packets to an Ellenex Pre-Configured Outdoor Gateway. The gateway acts as a transparent Layer-1/Layer-2 RF-to-IP bridge. Learn More
-
Option B (Cellular NB-IoT / LTE-M Option): Transmits encrypted telemetry directly across licensed 3GPP cellular networks to public mobile base station towers. Learn More.
-
_edited.png)
3. Network Core & Data Routing Layer: Encrypted sub-GHz packets are securely routed from the gateway to the Ellenex Network Server (LNS). The LNS manages crucial network functions—including device authentication, payload decryption, and frame deduplication—ensuring clean, secure sensor data is seamlessly delivered to Ellenex Software Platform.
4. Data Processing & Platform Visualization: All telemetry is ingested, decoded, and visualized seamlessly within the Ellenex Cloud Software Platform. The software transforms raw sensor data into actionable insights through real-time dashboards, historical trend analysis, threshold alerting, and device health management.

Connectivity & Visualisation Platform

With its advanced features and ease of use, Ellenex’s software platform enables effective monitoring and management of remote operations—ensuring efficient, sustainable, and reliable resource management.
-
Encrypted ultra-low power communication protocol.
-
Advanced device inventory.
-
Integration of APIs for enterprise systems.
-
Multi-tenant role-based access control.
-
Data export and import.
-
White-label platform for enterprise runs on private accounts.
-
Variable alarm setting for high and low thresholds and multi-channel alerting.
-
Sampling and transmission interval configuration.
-
Transmission condition configuration.
-
Other configurations and customizations available on request.
Ellenex's software platform is a comprehensive, user-friendly solution specifically designed for remote monitoring and management.
The platform offers a robust range of features tailored for off grid, distributed, and critical operations, including:
-
Real-Time Data Visualization: Monitor live operational status, levels, and key metrics across all your locations from a centralized dashboard.
-
Customizable Alerts & Notifications: Receive instant warnings for threshold breaches, sudden drops, or anomalous activity before minor issues become costly failures.
-
Historical Data Analysis & Predictive Analytics: Track consumption patterns, analyze usage trends, and forecast future demand to optimize maintenance and supply schedules.
-
Seamless System & API Integration: Easily feed raw or aggregated telemetry into your existing enterprise software, SCADA, or ERP systems using Ellenex’s secure Open API.
Key Benefits
Ellenex Software Platform Dashboard
Individual Device Details & Data Analytics View
Parameter Configuration and GPS Location View
Device Management Interface
Historical Data & Performance Analytics
Remote Command and Downlink Control Log





Ellenex Asset Monitoring App
Custom alert and Notification Setup Interface
Data Export and Reporting Interface
Webhook and Data Forwarding Interface
Sensor Calibration and Formula Configuration
Integration Options
A core competitive advantage of the solution is its complete pre-configured, plug-and-play design. Both the cellular and LoRaWAN (with local gateway) variants arrive fully configured and ready for connection to the Ellenex platform out of the box, eliminating the complexities of local software setup, sensor programming, or manual network registration.
The end-to-end package includes the following integration characteristics:
-
Zero Technical Hassles: No extra power tools, driver setup, or developer configurations are required. Deployment is completed in under 5 minutes.
-
Pre-Configured Gateway Provisioning: The industrial outdoor gateway is pre-commissioned to automatically bind with the Ellenex LNS stack. Once powered via PoE or DC, it immediately discovers sensors, decrypts the payloads, and relays them directly to the centralized cloud dashboard, seamlessly routing data to the Ellenex Platform.
-
Pre-Configured SIM & Connectivity: For NB-IoT deployments, the transmitter is shipped with a pre-configured 4FF Nano-SIM card and active carrier subscription, ready to transmit on regional networks immediately upon power-up.
-
Unified Fleet Visualization: Once powered on, both device variants automatically check in and populate their respective live measurement streams to the user’s centralized mobile app or web dashboard.
Frequently Asked Questions
How does the Dam and Water Resource Level and Volume Monitoring Solution operate in open water bodies?
The Dam and Water Resource Level and Volume Monitoring Solution utilizes a heavy-duty marine floating buoy housing the wireless transmitter, which floats on the surface of the dam or reservoir. An IP68-rated 316L stainless steel hydrostatic pressure probe is lowered from the buoy to the bottom of the water body. The probe measures the exact water column pressure above it, converts that pressure into precise liquid depth, and relays the signal to the buoy transmitter. The buoy then broadcasts encrypted telemetry via LoRaWAN® or NB-IoT/LTE-M to the Ellenex Software Platform for live storage tracking.
How does the solution convert raw water level depth into volumetric storage capacity (Megalitres or cubic meters)?
The Ellenex Software Platform features an integrated formula configuration and volume calibration engine. Users can upload site-specific bathymetric survey data, depth-to-volume rating curves, or geometric dam dimensions directly into the platform interface. Once mapped, incoming live hydrostatic depth readings are automatically transformed into total stored volume ($\text{m}^3$ or Megalitres) and percentage full capacity (%), giving operators instantaneous visibility into total stored water reserves.
How do I install the Dam and Water Resource Level and Volume Monitoring Solution in a remote farm dam or tailing pond?
Deployment is fast and straightforward, requiring no specialized power tools, developer setup, or wiring. Field personnel attach the weighted IP68 hydrostatic probe to its heavy-duty cable, lower it from the floating buoy unit, and launch the buoy into the dam. The buoy can be tethered to a bank anchor or mooring line to keep it positioned in deeper water away from shallow shorelines. Once turned on via its internal switch, the pre-configured system automatically connects and begins streaming live data to the Ellenex Software Platform.
How does the floating buoy handle fluctuating water margins and shifting shorelines during droughts or heavy rain?
Fixed shore-mounted sensors often become stranded above the waterline during severe droughts or submerged during floods. The Dam and Water Resource Level and Volume Monitoring Solution solves this by using a UV-resistant, impact-proof floating buoy that rises and falls naturally with water levels. Because the buoy moves vertically with the water surface, the submerged hydrostatic probe maintains its fixed position relative to the dam floor, delivering continuous, uninterrupted depth readings regardless of shoreline retreat.
How are water managers notified through the Ellenex Software Platform if a dam reaches spillway capacity or experiences abnormal drawdown?
The Ellenex Software Platform includes a customizable multi-channel dynamic alert engine. System administrators can configure dynamic high-water thresholds (e.g., spillway overtopping warnings) and abnormal drawdown alerts (indicating pipe leaks or illegal pumping). If water levels cross set parameters, the platform immediately dispatches automated alerts via SMS, email, or mobile app push notifications, enabling rapid operational responses.
How does atmospheric pressure compensation work on an open water floating buoy?
Barometric weather changes can affect uncompensated hydrostatic pressure readings. To ensure complete accuracy, the hydrostatic sensor cable includes an internal capillary vent tube that runs up into the vented, weather-sealed buoy enclosure. This tube references the internal sensor element directly to surrounding atmospheric pressure, automatically canceling out barometric weather shifts and ensuring true liquid depth measurements year-round.
What routine maintenance is required for the system over its operational lifespan?
The solution is engineered to be virtually maintenance-free. Powered by an internal, replaceable 3.6V Lithium ($\text{LiSOCl}_2$) primary battery and controlled by ultra-low-power firmware, it requires no external solar panels, battery charging, or power wiring. Depending on the data transmission frequency set on the Ellenex Software Platform (such as bi-hourly or daily updates), the battery delivers an operational field lifespan of up to 10 years before requiring replacement.
Do you want to discuss your application?
Contact us for a customized applications
Please fill out the form to set consultation session with our team and discuss your application.





